|
 |
 |
 |
 |
Real-time monitoring for 24-7-365
in GTAC (Global Technical Assistance
Center). |
 |
Record of Daily Report through periodic
and occasional inspection mort than
2 times in a day by field maintenance
staff. |
 |
Precaution of problem occurrence through
the analysis of operation trend in a
week per each Unit . |
|
|
|
|
 |
 |
 |
Responsible
for all necessary materials, manpower, equipments
etc. for recovery |
|
|
|
|
|